FORUM MITTELRHEIN, KOBLENZ
Opening
The start of construction was in August 2012 and the center is going to be opened in fall 2012.
Sales area
approx. 20,000 sqm on three levels
Branch and Tenant Mix
Around 80 to 90 shops including restaurants/cafés and a cultural building with approx. 12,000 sqm floor space.
Sustainability
The shopping center has already been awarded with the Pre-Certificate in Gold by the German Sustainable Building Council (DGNB) for its ecological and energysaving master concept.